Cameras, Racks and Power · #81

Online Rack Unit Layout Planner

Places devices at U positions and shows overlaps and devices that do not fit.

  • Data is processed in your browser and not sent to a server
  • Export: CSV

Tool

pos: 1 is the lowest U. With qty > 1 only the first device is fixed.

Static load limit of the rack; optional.

What does this tool do?

If rules such as 'UPS at the bottom, patch panel at the top' are forgotten when rack installation starts on site, you end up removing and refitting. The tool places devices with a fixed position (pos), stacks the rest from the bottom optionally heaviest first and returns the rack view as a top-to-bottom table.

How to use it

  1. CSV header: name, u required; qty, kg, w, pos optional (pos = lowest U of the device).
  2. Enter rack height and load capacity; choose whether heavy devices go to the bottom.
  3. Press Run; download the layout as CSV.

Fields

Device list (CSV)
pos: 1 is the lowest U. With qty > 1 only the first device is fixed.
Rack height
Load capacity
Static load limit of the rack; optional.
Place heavy devices at the bottom

Worked example

InputValue
Device list (CSV)
name,u,qty,kg,w,pos
UPS 3 kVA,2,1,32,,
Ek akü modülü,2,1,45,,
Sunucu,2,3,22,450,
NVR,2,1,12,120,
PoE switch,1,2,4,740,
Patch panel,1,2,1,,40
Fiber ODF,1,1,2,,42
Kablo düzenleyici,1,2,1,,
Rack height42
Load capacity600
Place heavy devices at the bottom✓

Expected result: 19 U used, 23 U free; battery module 1–2, UPS 3–4, servers 5–10, NVR 11–12, switches 13–14; patch panel at 40 and ODF at 42 fixed; total 169 kg, 2,950 W.

You may want 1–2 U of space between servers and PoE switches for heat and cable management; the empty rows make that easy to plan. Total power feeds the PDU and UPS tools.

Second scenario

InputValue
Device list (CSV)
name,u,qty
Sunucu,2,6
Switch,1,1
Rack height12
Place heavy devices at the bottom✓

Expected result: Six 2 U servers fill a 12 U rack exactly; there is no room for the switch.

Method and assumptions

Devices with pos are placed first (overlap or outside the rack is an error). The rest are sorted by weight if chosen and placed from the bottom in the first free run of enough consecutive U.

Using the result and troubleshooting

Check total power in the PDU and UPS tools and device depth and cable direction in vendor drawings. Heed the warning about devices over 25 kg in the upper half.

Limits and common mistakes

  • Device depth, front/rear mounting, 0U PDUs and airflow direction are not modelled.

Frequently asked questions

Why do U numbers start at the bottom?

Most rack rails are numbered bottom to top; the tool shows the table top to bottom as if facing the rack.