Maintenance, Modernization and Management

Camera Project Management and Acceptance Testing

The way to reduce disputes at handover is to write down what will be delivered from the start. If you’re running your camera project with another contractor, we take on project management and acceptance testing on the investor’s side: work plan, interim checks, site supervision, image goals, recording and retention, network and security tests, documentation checks and a punch list. The system is accepted after being measured against the specification.

Investor sideWork planSite supervisionInterim checksImage acceptanceRecording and retention testSecurity checkPunch list

Service definition

What are camera project management and acceptance testing, and who are they for?

In this service, carried out on behalf of the investor, the contractor’s work is tracked against the specification and contract, and the system is verified with measurable criteria before handover. Acceptance tests cover image quality, coverage, recording continuity, retention period, network, power, security settings, user permissions and documentation.

01

Do you also help with contractor selection?

Yes. Bid evaluation is part of our consulting service.

02

How long do acceptance tests take?

It depends on the number of cameras. We offer two options: sampling and full testing.

03

What if the contractor doesn’t accept the tests?

That’s why we recommend adding the criteria to the contract at the start of the project. Criteria in the contract are binding at handover.

Project stages

How do we proceed?

01 / STAGE

Preparation

Criteria and plan.

02 / STAGE

Follow-up

Site and interim checks.

03 / STAGE

Acceptance

Tests and sign-off.

04 / STAGE

Closeout

Punch list and handover.

Video Surveillance

Let’s verify that the system you paid for is delivered to specification

Let’s talk about your specification and project schedule; we’ll come back with a written proposal covering acceptance criteria and a tracking plan.